Shanghai Yingbin Water Treatment Plant Project

Construction site with a large robotic tunneling machine surrounded by safety barriers, equipment, and construction vehicles on a city street.

Φ 15.1m Herrenknecht VSM Depth: 29.03m

Project year: 2024

Architectural blueprint drawing of a building floor plan with measurements and structural details.

Project Overview

Project Summary

  • Upgrade to the original Yingbin Water Treatment Plant Project

Jello-Mud Results

  • Demonstrated Jello-Mud’s better lubrication, water-proofing, and annular-ring forming capability in VSM projects.

Close-up of electrical wiring and conduits installed inside a wall, with some concrete and plaster work ongoing.

Onsite photos of Jello-Mud injection point (left) and Jello-Mud replacement (right).